[1]
H. Yang, Y. Tang, and Z. Li, “A Balanced Optimization Approach to Inspection and Disassembly in Multi-Stage Manufacturing Systems”, HSET, vol. 156, pp. 95–104, Oct. 2025, doi: 10.54097/myd0e394.